The system
The grid operator's connection offer states how much power the site may draw.
Sources checked .

Physical infrastructureElectricity and sites
How it works
A data centre draws electricity through a grid connection. The connection offer fixes how much power the site may use, even if the building could hold more equipment.
- Grid operators
- Data-centre owners
- Electricity suppliers
- Planning authorities
- Constraint
- The local network may not have room for the requested load. The project may have to wait for new grid equipment.
- Who decides
- The grid operator decides how much capacity to offer and on what terms. The planning authority decides whether the site may be built.
Applicable rules
Large-load tariff proceedings
FERC is examining who should bear the connection cost when a very large load applies for grid access. The proceedings also cover reliability risk.
FERC release and orders
Processors and cloud accessMachines and cooling
How it works
During training, servers change the model's weights. During inference, they use the saved weights to calculate an output.
- Chip suppliers
- Cloud operators
- Data-centre operators
- Compute customers
- Constraint
- Specialised AI processors can be hard to obtain. The electricity available to each rack may also limit how many processors the site can run.
- Who decides
- An export licence may decide where a chip can be delivered. Once it is installed, the cloud contract decides who may use it.
Applicable rules
Advanced-computing export controls
US export rules apply by destination and end user. For a covered chip, the available licence route may decide whether the sale can proceed.
Export Administration Regulations, Part 740Competition powers over cloud-linked software
If the CMA designates Microsoft as having strategic market status, it may later impose conduct requirements.
CMA case page
ModelsWeights and training
How it works
Training produces the numerical weights stored in a model.
- Model developers
- Model providers
- Training partners
- Downstream integrators
- Constraint
- A large training run requires specialised processors and sufficient memory.
- Who decides
- The provider decides whether downstream companies receive the model and what they are allowed to do with it.
Applicable rules
EU provider obligations
The AI Act requires providers of general-purpose AI models to keep documentation and give specified information to downstream providers.
European Commission GPAI guidanceCalifornia frontier-developer duties
SB 53 requires covered developers to maintain a safety framework. It also requires reports of specified critical incidents.
California chaptered SB 53 text
DeploymentServices and decisions
How it works
A company puts a model into a service or uses its output in a decision.
- Deployers
- Platform operators
- Software customers
- People subject to decisions
- Constraint
- The deployer may need the model or cloud provider to make a change before it can update the service.
- Who decides
- The service operator normally controls what the user sees and how a decision is made. A contract may leave part of that choice with the platform provider.
Applicable rules
AI Act transparency duties
Article 50 assigns duties according to the company's role and how specified AI output is presented.
European Commission Article 50 FAQRules for consequential decisions
Colorado's replacement law covers technology used to make a consequential decision or materially influence one.
Colorado Attorney General rulemaking pageSynthetic-content labels
China's measure applies to the service that creates covered content and to the platform that distributes it.
Cyberspace Administration of China measureCompetition powers over cloud-linked software
A strategic-market-status designation would allow the CMA to impose later conduct requirements.
CMA case page
InstitutionsRules and enforcement
How it works
Authorities apply rules through their legal powers. Courts decide disputes over the resulting orders and interpretations.
- Legislatures
- Regulators
- Courts
- Public-sector buyers
- Constraint
- The authority's mandate determines which companies and conduct it can reach.
- Who decides
- An authority may issue an order or impose a licence condition. Competition law provides separate designation powers.
Applicable rules
Public enforcement under the AI Act
National authorities enforce the current transparency duties.
European Commission Article 50 FAQFederal tariff proceedings
Federal Power Act proceedings can change the tariff terms governing grid access for large loads.
FERC release and orders